TOP
經典不再等待!讀懂羅馬人的強大,開啟你的智力冒險
CDM REGULATIONS PROCEDURES MANUAL 3E
滿額折

CDM REGULATIONS PROCEDURES MANUAL 3E

商品資訊

定價
:NT$ 3990 元
優惠價
903591
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點 :107 點
商品簡介
作者簡介
名人推薦
目次

商品簡介

This Procedures Manual provides a documentation system which has been developed by a practising CDM co-ordinator for use with the Construction (Design and Management) Regulations 2007.
It addresses the full range of obligations on all parties for compliance with the statutory requirements and features:
flow charts
checklists
model forms
The revised Third Edition of the Manual reflects the extensive changes to the CDM Regulations 2007, including:
the new role of CDM co-ordinator
wider and more onerous duties on clients
changes to the design process
wider requirements for competence
integration of duty holder roles
The Manual also takes account of the 2007 Approved Code of Practice. It will function as a control document for quality assurance purposes.

作者簡介

Stuart Summerhayes is a chartered civil engineer and a fellow of the Association for Project Safety. After an early period in heavy civil engineering contracting he spent an extensive period in university education delivering construction related undergraduate and postgraduate courses.
For the past decade he has been delivering a portfolio of CDM related courses and project management training to industry as well as managing planning supervision/CDM co-ordination teams across numerous sectors of construction.
He is the managing director of Synergy Construction Management Consultancy Ltd, which was the first accredited and validated training provider for the Association for Project Safety in the delivery of 'The Management of CDM Co-ordination' courses, which are offered as open and in-house courses throughout the UK. He is also the president of APS.

名人推薦

"Well conceived and presented." Occupational Health & Safety"This important procedures manual has been carefully compiled by a chartered civil engineer who is a fellow of the Association for project safety." RoSPA Occupational Safety & Health Journal

目次

Section 1.
Introduction;.
Section 2 Application and interpretation.
2.1 Application; Table 2.1 The main responsibilities of duty holders; 2.2 Interpretation; 2.3 Additional exclusion.
Section 3 All duty holders.
3.1 Introduction; Table 3.1 Project management descriptors found in the regulations; Figure 3.1 Holistic diagram.
Section 4 The client .
4.1 Client fl owchart: all projects; 4.2 Client flowchart: notifi able projects, additional duties; 4.3 Client checklist; 4.4 Client checklist: notifi able projects.
Section 5 The designer.
5.1 Introduction; Figure 5.1 Regulations to be discharged by designers; 5.2 All projects; 5.3 Identifi cation; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 Systems approach for the designer; 5.1 Designer flowchart: all projects; 5.2 Designer flowchart: notifiable projects, additional duties; 5.3 Designer checklist: all projects; 5.4 Designer checklist: additional duties for notifi able projects.
Section 6 The contractor.
Figure 6.1 Contractor duties: all projects; 6.1 Contractor flowchart: all projects; Figure 6.2 Contractor: additional duties on notifi able projects; 6.2 Contractor fl owchart: notifi able projects, additional duties; 6.3 Contractor checklist: all projects; 6.4 Contractor checklist: notifi able projects, additional duties.
Section 7 The CDM co-ordinator.
7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM co-ordination duties; 7.1 CDM co-ordinator flowchart; 7.2 CDM co-ordinator checklist.
Section 8 The principal contractor.
Figure 8.1 Regulations to be discharged by principal contractor; 8.1 principal contractor flowchart; 8.2 principal contractor checklist.
Section 9 Documentation .
9.1 Introduction; 9.2 Pre-construction information; Figure 9.1 Flow of pre-construction information and Pre-construction information: tender stage; 9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 Project risk register (health and safety).
Section 10 Checklists and agendas.
10.1 Checklist for non-notifi able projects;10.2 Checklist of additional duties for notifi able projects; 10.3 Initial design/client meeting: prompt list; 10.4 Pre-start meeting: prompt list (non-notifiable projects); 10.5 Pre-start meetings: prompt list (notifiable projects); 10.6 Progress meeting: prompt list.
Section 11 Competence.
Web page directory.
Bibliography.
Index

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 3591
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區