Quick Changeover for Operators ─ The Smed System
商品資訊
系列名:Shopfloor Series
ISBN13:9781563271250
出版社:Productivity Pr
作者:Productivity Press Development Team (COR); Shigeo Shingo
出版日:1996/10/01
裝訂/頁數:平裝/77頁
規格:26.0cm*18.4cm*1.3cm (高/寬/厚)
商品簡介
商品簡介
Changeover is the process of setting up a production line for a different process or product. Many plants take hours or even days to do a changeover - a major barrier to manufacturing flexibility. Quick Changeover for Operators, based on Shigeo Shingo's SMED system, teaches frontline employees the techniques and approaches that turn hours of changeover time into minutes, even seconds! Now the learning format in the Shopfloor Series makes these powerful techniques accessible to the whole workforce.
SMED is short for "Single-Minute Exchange of Die." The "single" here means a single-digit number of minutes - less than ten. The SMED approach is simple and universal. It works in companies all over the world. Although it was first used in (and named for) manufacturing with dies, the basic principles of SMED have been used to reduce setup and turnaround time in all types of manufacturing, assembly, and even service industries, from process and packaging plants to airlines.
SMED is short for "Single-Minute Exchange of Die." The "single" here means a single-digit number of minutes - less than ten. The SMED approach is simple and universal. It works in companies all over the world. Although it was first used in (and named for) manufacturing with dies, the basic principles of SMED have been used to reduce setup and turnaround time in all types of manufacturing, assembly, and even service industries, from process and packaging plants to airlines.
主題書展
更多書展購物須知
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

