TOP
0
0
即日起~6/30,暑期閱讀書展,好書7折起
土木工程專業英語(簡體書)
滿額折

土木工程專業英語(簡體書)

商品資訊

人民幣定價:43 元
定價
:NT$ 258 元
優惠價
87224
領券後再享89折起
海外經銷商無庫存,到貨日平均30天至45天
可得紅利積點:6 點
相關商品
商品簡介
名人/編輯推薦
目次
書摘/試閱

商品簡介

《土木工程專業英語》是應用型本科院校土木工程專業系列教材之一。教材共有4大部分,13個單元,35課。有結構設計、建筑施工、工程管理和閱讀材料,內容涉及力學、結構分析與設計安全、建筑材料、結構物設計、基礎施工、逆作法施工、混凝土結構物施工、預制件工程、隧道工程、道橋工程、工程招投標、工程管理、項目管理等。
《土木工程專業英語》可作為應用型本科院校土木工程專業教學用書,也可供學生自學使用。

名人/編輯推薦

《土木工程專業英語》是應用型本科院校土木工程專業系列教材之一。

目次

PART Ⅰ BUILDING STRUCTURES
Unit 1 Structural Analysis and Safety
Text 1 Structural Analysis
Text 2 Structural Safety
Text 3 Structural Reliability
Unit 2 Building Materials
Text 1Stress and Strain
Text 2 Properties of Concrete
Unit 3 Structure Design
Text 1Reinforced Concrete Structures
Text 2 Loads on Building Foundations
Text 3 Design of Beams

PARTⅡ CONSTRUCTl0N TECHNIQUES
Preface Future Trends in Construction
Unit 4 Foundation Engineering
Text lEarthworks
Text 2Foundation Construetinn
Text 3 Piles
Unit 5Steel-Concrete Engineering Construction
Text lConcrete Construction
Text 2Forms for Concrete Structure
Text 3 Reinforcing Steel for Concrete
Unit 6 Inverse Construction
Text 1Introduction
Text 2 Technique of Vibro-Replacement
Text 3Controlling Technique of Differential Settlement of Structure in Construction
Text 4 Technique of Preventing Various Parts of the Structure from Cracking
Unit 7 Precast Engineering
Text 1 Prestressed Concrete
Text 2 Methods of Prestressing
Unit 8 Tunnel Engineering
Text 1 HOW Tunnels Are Built
Text 2 Shields
Unit 9 Bridge and Road Engineering
Text 1 Bridge Design and Construction
Text 2Road Construction

PART Ⅲ BUILDING CONSTRUCTION MANAGEMENT
Unit 10 Tendering and Bidding on Construction
Text 1 Bidding Theory
Text 2 Bidding.Bid Opening and Award of Contract
Text 3 FIDIC Tendering Procedure
Unit 11Construction Management
Text 1 Project Management
Text 2C0st and C0ntrol
Text 3 Total Quality Management for Construction
參考答案
參考文獻

書摘/試閱

Experience has shown that for projects involving international tendenng,prequalification is desirable since it enables the employer/engineer to establish the competence 0f comDanies subsequently invited to tender.It is also in the interest of contractors since,if prequalified.thev will know that they are competing against a limited number of other firms。all of whom possess the required competence and capability.Prequa JifjCatjon of Tenderers Prequalification documents should give information about the project,the tendering procedure and the prequalification procedure.They should also specify what data is required from contractors wishing to prequalify.The documents are prepared by the employer/engineer and will normallvinclude the following:Letter of invitation to prequali~;Information about the prequalification procedure;Project information;Prequalification application. The employer/engineer should publish a notice inviting interested contractors to apply for prequalification documents,stating that tender documents will be issued only t0 a limited number of companies/joint ventures selected by the employer/engineer as having the necessary qualificationsto perform the work satisfactorily. The notice should be published in appropriate newspapers and journals to give sufficient publicity according to the particular circumstances of the project.The notice may als0 be issued t0financing institution representatives,if relevant,and to government agencies responsible for foreigntrade SO that the international community receives timely notification of the proposed pmject andinstructions on how to apply. The notice should be reasonably brief and where feasible contain:(1)Name of the employer;(2)Name of the engineer;(3)Location of the project;(4)Description of the project and scope ofthe work;(5)Source of finance;(6)Anticipated program(i.e.award of contact.completion and anyother key dates);(7)Planned dates for issue of tender documents and submission of tenders:(8)Instructions for applying for prequalification documents;(9)Date by which applications toprequalify must be submitted;(10)Minimum qualification requirements and any particular aspectswhich could be of concern to prospective tenderers. The period between the notice of invitation to prequali~and the latest date for the r_etum ofcompleted applications should not be less than four weeks.

您曾經瀏覽過的商品

購物須知

大陸出版品因裝訂品質及貨運條件與台灣出版品落差甚大,除封面破損、內頁脫落等較嚴重的狀態,其餘商品將正常出貨。

特別提醒:部分書籍附贈之內容(如音頻mp3或影片dvd等)已無實體光碟提供,需以QR CODE 連結至當地網站註冊“並通過驗證程序”,方可下載使用。

無現貨庫存之簡體書,將向海外調貨:
海外有庫存之書籍,等候約45個工作天;
海外無庫存之書籍,平均作業時間約60個工作天,然不保證確定可調到貨,尚請見諒。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:87 224
海外經銷商無庫存,到貨日平均30天至45天

暢銷榜

客服中心

收藏

會員專區