TOP
💡 邁向小一的第一步!給孩子一本「查得到自信」的專屬辭典,輕鬆跨越閱讀關卡!🚀
Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects
滿額折

Convergence and Divergence of Theory of Constraint(s) and Lean Manufacturing in Construction Projects

商品資訊

定價
:NT$ 6235 元
若需訂購本書,請電洽客服 02-25006600[分機130、131]。
無法訂購
商品簡介

商品簡介

Master's Thesis from the year 2018 in the subject Art - Architecture / History of Construction, grade: Distinction, Queen's University Belfast, language: English, abstract: The purpose of the study is to provide effectively managed constraints by defining constraints that prevent their targets and thus to increase the profitability of firms. Identifying and removing constraints from bottleneck activities help to reduce uncertainties in construction processes and increases the transparency of project management. Various continuous improvement (CI) strategies have been developed and applied to improve manufacturing system performance. This paper studies the combination of two distinct strategies, Lean Manufacturing (LM) and Theory of Constraint(s) (TOC), for improving manufacturing system performance. The research includes reviews of these two methodologies and the implementation process involved in each strategy. Examination of the possibilities to improve manufacturing system performance through integration of these two strategies. The effectiveness of the integrated approach along with an examination of different factors, recommendations, and presentation of best possible management practices for the application of this integrated approach. In an organization, there are attempts to achieve multiple projects with common, shared resources; the work can be challenging. Managers might find themselves on project overload with continual resource shortages and difficulty in determining the most important tasks. The focus of the research is on the elimination of non-value added activities through an application of a management philosophy that identifies and eliminates the waste from each step in the production throughout the Value Stream. A comparative analysis is carried out through reviews and studies regarding Lean Process and TOC- application to determine the manager's potential benefits like reduced production lead-time and lesser work-in-process inventory.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 6235
若需訂購本書,請電洽客服 02-25006600[分機130、131]。

暢銷榜

客服中心

收藏

會員專區