Population Based Search Heuristics for Scheduling Job Shops Associated with Multiple Routings
商品資訊
ISBN13:9788119811038
出版社:Lightning Source Inc
作者:B. S. Girish
出版日:2024/01/15
裝訂:平裝
規格:22.9cm*15.2cm*1cm (高/寬/厚)
商品簡介
This thesis addresses two different models of job shop scheduling applications that are associated with multiple routings. The first application is the well known scheduling model, generally addressed in the literature as Flexible job shop scheduling problem (FJSP), which belongs to the category of toughest NP-hard problems. The second scheduling model addressed in this thesis is based on the production environment of a capital goods industry in which the components of different products are processed and assembled in an assembly job shop type environment. The processing operations on all components in the model also consider alternative routing option. This problem is, therefore, addressed as assembly job shop scheduling associated with multiple routings (AJSP), which is much more complex than FJSP. To solve such NP-hard problems, heuristic approaches have emerged as a promising alternative to the mathematical approaches. Three population based search heuristics, a Genetic Algorithm (GA), an Ant Colony Optimization (ACO) algorithm and a Particle Swarm Optimization (PSO) algorithm, are proposed to evolve optimal schedules for both the models. The performance of the three population based search heuristics for FJSP are tested with various benchmark instances for minimum makespan time criterion and evaluated by comparing their solutions with the lower bound solution (LB), best known solution (BKS) and the solution obtained with constraint programming formulation (CPF) for the problem solved using ILOG Solver. The performance comparison reveals that the proposed algorithms outperformed CPF and are competent with the existing approaches. The proposed algorithms are, therefore, effective tools for solving FJSP instances. The performance of the three population-based search heuristics for AJSP are tested with various problem instances for minimum total tardiness cost criterion and the results obtained are compared with the results of CPF solved using ILOG Solver. The performance comparison reveals that the proposed heuristics perform better than the CPF.
主題書展
更多書展購物須知
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

