TOP
紅利積點抵現金,消費購書更貼心
Streamline Workflows: Boost Labor Productivity

Streamline Workflows: Boost Labor Productivity

商品資訊

定價
:NT$ 1019 元
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點:30 點
商品簡介

商品簡介

The purpose of this research was to evaluate contextual factors affecting labour productivity on construction projects, and whether these factors differ based on construction projects, company or location. According to a report by McKinsey Global Institute (MGI) (2017), globally, the construction industry accounts for 13% of the Gross Domestic Product (GDP) and employs 7% of the world's working population, making the construction industry one of the leading contributors to GDP (PWC, 2016; Barbosa et al., 2017; StatsSA, 2017). Barbosa et al. (2017) said that in the past 20 years the construction industry has had a 1% annual productivity growth globally. Durdyev and Mbachu (2011) argue that productivity outside of the contextual definition and clarity of the construction project's objectives is a complicated concept to understand. Construction and labour productivity are described as output obtained divided by input expended by Tran and Tookey (2011) and the Organisation for Economic Cooperation and Development ([OECD] 2011) respectively. While the Building and Construction Sector Productivity Taskforce (BCSPT) expand on this noting that productivity is the construction industry's ability to convert inputs into outputs (BCSPT, 2009). Whiteside (2006) proposes that labour productivity is the output average of direct labour hours to install a unit of material. However, Allmon et al. (2000) argue that labour productivity can only be defined when an organisation or the project has identified the base or norm of what constitutes labour productivity. This study agrees with the proposition raised by Allmon et al. (2000) because logically a base or norm will be required to know whether labour is productive or not. It follows that if a construction project commences without clarity on the expectation level of productivity or a standard for efficient labour productivity, there will be no knowledge of how the project has performed. Throughout literature, different scholars view

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 1019
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區