★ FIDIC 2017 黃皮書條款全解析,一冊掌握實務核心
★ 收錄 2022 修訂重點+COVID-19+烏克蘭戰爭影響
★ BIM 專案適用實務指引同步補強
★ 35 年實戰經驗淬鍊,工程契約必備工具書
工程專案愈來愈複雜,風險分配、工期展延、不可抗力、索賠與爭端解決,每一條條款都可能牽動數億元的責任歸屬。本書以 FIDIC Yellow Book 為核心基礎,系統化拆解 2017 年版 21 條款架構,並整合 2022 年修訂內容與最新國際實務發展。
從整體 FIDIC 契約體系導論出發,逐條說明《Plant and Design-Build(黃皮書)》各條款與子條款之間的邏輯連動,並加入作者 35 年第一線實務經驗,解析 COVID-19、烏克蘭戰爭對工程履約的影響,以及 BIM 專案下的契約適用建議。
無論是初次接觸 FIDIC 的工程師、顧問、業主代表,或是已熟悉條款卻需要實務對照的資深專業人士,本書都是不可或缺的案頭工具書。
FIDIC Yellow Book is a practical guide for anyone involved in preparing, administering, or contributing to the FIDIC suite of contracts, 2017 edition. This revised edition covers a number of recent developments including the 2022 amendments, further examples drawn from experience with the 2017 contracts, impacts of COVID-19, and the war in Ukraine, as well as guidance on use of FIDIC Contracts where a project uses Building Information Modelling. Designed as a companion for both the first-time and also more experienced user the book presents an accessible guide to the 21 clauses of the 2017 FIDIC Conditions of Contract, using the Conditions of Contract for Plant and Design-Build (Yellow Book) as a basis.
Opening chapters provide an introduction to the entire FIDIC suite of contracts. Part 2 provides a clause-by-clause introduction to each of the Clauses and Sub-Clauses in the Yellow Book, and explain how they are interlinked. A final section includes a concise practical guide to the use of the FIDIC Conditions, and a summary of special provisions discussed in Part 2.
Drawing on the author's 35 years' experience with the FIDIC Conditions of Contract, this accessible guide to the FIDIC Yellow Book provides an ideal introduction for first time users of the FIDIC conditions of contract and will also serve as a very useful handbook and practical commentary for more experienced users.
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。