In southern Mali, between Siby and Kalassa, several facilities for the CAAS development aid project have been built since 2018. A campus serves to train young women in small-scale farming techniques, while an agricultural enterprise provides practical training and production. The buildings are complemented by individual measures for school education, sports, medical care, and infrastructure. The publication documents the project by the Munich-based firm Wieland Schmidt Architekten in detail, from urban planning to details, and explains how it takes the climatic conditions of the Sahel into account. External contributions shed light on the development of the overall project, provide architectural and sociological context, and show that the plans are shaping the village beyond the boundaries of the campus.
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。