TOP
0
0
【簡體曬書區】 單本79折,5本7折,活動好評延長至5/31,趕緊把握這一波!
Time Out: Using Visible Pull Systems To Drive Process Improvement
滿額折

Time Out: Using Visible Pull Systems To Drive Process Improvement

定  價:NT$ 2608 元
優惠價:902347
領券後再享88折
無庫存,下單後進貨(到貨天數約30-45天)
可得紅利積點:70 點
相關商品
商品簡介
作者簡介
目次

商品簡介

Time Out introduces a revolutionary process, Visible Pull, for integrating the new world-class management tools aimed at cycle time reduction, quality improvement, and optimum customer service. Many leading companies—DuPont, Union Carbide, and International Specialty Chemicals—have seen significant benefits from its application. Typical benefits have included a 10 to 20 percent gain in capacity, a 30 to 40 percent reduction in inventory, a 50 percent reduction in cycle time, and more. In this authoritative new book, one of Visible Pull's pioneers describes the development of Visible Pull and lays out a detailed roadmap for applying it to your own unique business. With thirty years of hands-on experience, Wayne Smith knows the obstacles that can impede improvement in a plant. Here, he outlines the changes in philosophy and behavior that must take place before progress can be made. Smith differentiates between the traditional, inefficient "push" scheduling, where forecasts are made and everyone pushes material forward to meet the schedule, and the Pull Systems, which limit and control production based on downstream demand. With Visible Pull, workstations act in concert with one another, which in turn enables the company to better allocate resources, build a culture of teamwork, and link time-on-line to business goals.
In a series of five logical, carefully structured segments, Smith takes you step-by-step through the entire Visible Pull process, including:
Making the Decision—helps you decide if Visible Pull is appropriate for your organization through a high-level overview of its goals, resource requirements, and potential benefits
Assessing and Planning—explains how to identify and assess opportunities for improvement, choose the right tools, and develop a specific plan for change
Pull Systems—demonstrates how to use Pull Systems as the primary tool for managing time in a process and how to apply them to your specific environment
Visible Management and Continuous Improvement—describes how to use Pull Systems to institute an ongoing improvement process, build employee involvement, measure your organization's evolving capabilities, and guide your future growth.
Replete with examples drawn from the experience of world-class manufacturers, Time Out in-cludes a full range of simulation techniques, as well as detailed, real-world application methods set within the context of an integrated enterprise.
Designed for manufacturing, operations, and distribution managers, supervisors, team leaders, design engineers, and others concerned with manufacturing processes, Time Out offers an immediate and unprecedented opportunity for truly breakthrough improvement.
Time Out offers a detailed roadmap for dramatically improving manufacturing cycle time in your company by using Visible Pull Systems to integrate and focus the complex array of competing management techniques. The book details how world-class businesses like DuPont, Union Carbide, and others have benefited from implementing cycle time techniques and how you can draw from the toolbox to meet your company's unique needs. With Visible Pull, companies learn how to maximize the use of their manufacturing workstations, allocate resources better, and link time-on-line to business goals. With a full range of real-world examples, simulation techniques, and application methods, Time Out offers manufacturing managers, supervisors, engineers, and others a dynamic new way of raising overall manufacturing performance.
"Wayne Smith has an obvious depth of technical and conceptual knowledge together with a breadth of manufacturing experience rarely found these days. Our members know the genuine article when they see it and Wayne Smith is asked back after every presentation."—William H. King, President, AME Northeast Region.
"The principles set forward in this book apply to every plant. Wayne Smith describes the basic principles of cycle time reduction, Visible Pull Systems, and bottleneck identification and protection, which are easily grasped from the CEO office down to the shop floor."—P. J. Boyle, Operations Manager, UOP LLC.
"By applying the simple, straightforward methods championed by Smith, your organization will see benefits pouring to the bottom line."—Alan Goodman, Corporate Quality Manager, ISP Company.
"Wayne Smith's cycle time reduction strategies and Visible Pull Systems are the glue that unifies all functions of the operation in all critical performance areas. Time is clearly the enemy of efficiency, and this is the best program I've seen to get the organization after it."—David E. Rousse, Vice President and General Manager, FiberMark, Inc.

作者簡介

WAYNE SMITH is the founder of Process/Time Management, a consulting management firm active in the development and application of cycle time techniques. Mr. Smith previously worked at DuPont, serving in the full range of plant management assignments as Manufacturing Manager for the Industrial Films Division, and ended his DuPont career as Corporate Manager of Continu-ous Flow Manufacturing. He is a frequent guest speaker at industrial conferences, including the American Society for Quality Control, the Association for Manufacturing Excellence (AME), and the Institute of Industrial Engineers. About the NAM The National Association of Manufacturers is the nation's largest broad-based industrial trade association. Its more than 14,000 member companies and subsidiaries, including more than 10,000 small manufacturers, are located in every state and produce roughly 85 percent of U.S. manufactured goods. Through its member companies and affiliated associations, the NAM represents every industrial sector, 185,000 businesses, and more than 18 million employees. The NAM is headquartered in Washington, D.C., and has regional offices across the country. For more information on the NAM, call David W. Walker, Assistant Vice President, Marketing and Member Services, at (202) 637-3186.

目次

MAKING THE DECISION.

An Overview.

The Foundation for Cycle Time.

A Process Overview.

How Will We Know When We're Done?

ORGANIZATION AND METRICS.

The Process Industry and the "We're Different" Syndrome.

Organizing For a Time Implementation.

Performance Metrics.

Other Organizational Tasks.

ASSESSING AND PLANNING.

Getting Started with the Core Team.

Cycle Time Mapping.

Simulation Modeling.

Assessing Opportunity.

Other Tools in the Toolbox.

The Business Plan.

PULL SCHEDULING.

The Pull Concept.

Pull Adaptations for the Process Environment.

Designing Pull Systems.

Additional Design and Management Considerations.

VISIBLE MANAGEMENT AND CONTINUOUS IMPROVEMENT.

Visible Management.

Linking Visible Management with Continuous Improvement.

Management Structure.

The Benchmarks.

Notes.

Bibliography.

Index.

您曾經瀏覽過的商品

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 2347
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區