TOP
GOGO開學趣,參考書應有盡有
The Jct Intermediate Building Contracts 2005 3E
滿額折

The Jct Intermediate Building Contracts 2005 3E

商品資訊

定價
:NT$ 5928 元
優惠價
905335
若需訂購本書,請電洽客服 02-25006600[分機130、131]。
商品簡介
作者簡介
目次

商品簡介

The 2005 version of the JCT Intermediate Building Contract has introduced a very different looking contract format and a number of changes to contract conditions. A completely new Intermediate Building Contract with Contractor's Design has also been issued.


This well established guide, which has been thoroughly updated, looks at the changes and key aspects of both forms, and takes account of new case law since the last edition of the book published in 1999. It also discusses the new subcontract agreements.

作者簡介

David Chappell BA(Hons Arch), MA(Arch), MA(Law), PhD, RIBA has worked as an architect in the public and private sectors and is currently the Director of David Chappell Consultancy Ltd. He frequently acts as an adjudicator and is author of ten books on construction law for Blackwell Publishing.

目次

Preface to the third edition; Chapter 1 The Purpose and Use of IC and ICD; 1.1 The background; 1.2 IC documentation; 1.3 The use of IC; 1.4 Completing the form;Chapter 2 Contracts Compared; Chapter 3 Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Errors; 3.1.4 Custody and copies; 3.1.5 Limits to use; 3.1.6 Notices ; 3.2 Insurance ; 3.2.1 Indemnity; 3.2.2 Injury to persons and property; 3.2.3 Things which are the liability of the employer; 3.2.4 Insurance of the Works: alternative clauses; 3.2.5 A new building where the contractor is required to insure; 3.2.6 A new building where the employer insures; 3.2.7 Alterations or extensions to an existing building; 3.2.8 Benefits for subcontractors; 3.2.9 Joint fire code; 3.2.10 Terrorism cover; 3.3 Summary ; Chapter 4 The Architect's Authority and Duties; 4.1 Authority; 4.1.1 General; 4.1.2 Express provisions; 4.1.3 The issue of instructions: general; 4.1.4 Instructions in detail; 4.2 Duties; 4.2.1 Duties under the contract; 4.2.2 General duties; 4.3 Summary ; Chapter 5 The Contractor's Obligations; 5.1 Express and implied obligations; 5.1.1 Legal principles; 5.1.2 Execution of the Works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Person-in-charge; 5.1.6 Levels and setting out; 5.2 Other obligations; 5.2.1 Access to the Works and premises; 5.2.2 Drawings, details and information; 5.2.3 Compliance with architect's instructions; 5.2.4 Suspension of performance; 5.2.5 Other rights and obligations; 5.3 Summary; Chapter 6 The Employer's Powers, Duties and Rights; 6.1 Express and implied powers and duties; 6.1.1 Co-operation or non-interference; 6.2 Rights; 6.2.1 General; 6.2.2 Deferment of possession of the site; 6.2.3 Deduction/repayment of liquidated damages; 6.2.4 Employment of direct contractors; 6.2.5 Rights as to insurance; 6.3 Duties; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7 The Clerk of Works; 7.1 Appointment; 7.2 Duties; 7.3 Responsibility; 7.4 Summary; Chapter 8 Subcontractors and Suppliers; 8.1 General; 8.2 Subcontractors; 8.2.1 Assignment and subcontracting; 8.2.2 Named persons as subcontractors; 8.3 Statutory authorities; 8.4 Work not forming part of the contract; 8.5 Third part rights and collateral warranties; 8.6 Summary; Chapter 9 Possession, Practical Completion and Defects Liability; 9.1 Possession; 9.1.1 General; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences ; 9.2.3 Partial possession and sectional completion; 9.3 Rectification period; 9.3.1 Definition; 9.3.2 Defects, shrinkages or other faults; 9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10 Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages; 10.2.3 Procedure; 10.2.4 Grounds; 10.3 Loss and expense claims; 10.3.1 Definition; 10.3.2 Procedure; 10.3.3 Matters grounding a claim; 10.4 Summary; Chapter 11 Payment; 11.1 The contract sum; 11.2 Payment before practical completion; 11.2.1 Method and timing; 11.2.2 Valuation; 11.2.3 Amounts included; 11.3 Payment at practical completion; 11.4 Retention; 11.5 Final payment; 11.6 The effect of certificates; 11.7 Withholding payment; 11.8 Variations; 11.9 Valuation of contractor’s designed portion; 11.10 Fluctuations; 11.11 Summary ; Chapter 12 Termination; 12.1 Termination by the employer; 12.1.1 General; 12.1.2 Grounds (clause 8.4.1): contractor's defaults; 12.1.3 Grounds (clause 8.5): insolvency of contractor; 12.1.4 Grounds (clause 8.6): corruption; 12.1.5 Grounds (clause 8.11): neutral causes; 12.1.6 Grounds (paragraph C.4.4 of schedule 1 and clause 6.10.2.2): insurance risks and terrorism cover;12.1.7 Consequences (clauses 8.5.3, 8.7 and 8.8); 12.1.8 Consequences (clauses 8.11 and paragraph C.4.4 of schedule 1); 12.2 Termination by the contractor; 12.2.1 General; 12.2.2 Grounds (clause 8.9): employer's faults; 12.2.3 Grounds (clause 8.10): insolvency; 12.2.4 Grounds (clause 8.11): neutral causes; 12.2.5 Grounds (paragraph C.4.4 of schedule 1 and clause 6.10.2.2): insurance risks and terrorism cover; 12.2.6 Consequences (clause 8.12); 12.2.7 Consequences (paragraph C.4.4 of schedule 1 and clause 6.10.2.2); 12.3 Summary; Chapter 13 Contractor’s designed portion (CDP); 13.1 General; 13.2 Documents; 13.3 The contractor’s obligations; 13.4 Liability; 13.5 Variations; 13.6 Insurance; 13.7 Summary; Chapter 14 Dispute Resolution Procedures; 14.1 General; 14.2 Adjudication; 14.2.1 The contract provisions; 14.2.2 The Scheme: notice of adjudication; 14.2.3 The Scheme: appointment of the adjudicator; 14.2.4 The Scheme: procedure; 14.2.5 The Scheme: adjudicator’s powers and duties; 14.2.6 The Scheme: the adjudicator’s decision; 14.2.7 The Scheme: costs; 14.3 Arbitration; 14.3.1 General ; 14.3.2 Procedure; 14.3.3 The appointment of an arbitrator; 14.3.4 Counterclaims; 14.3.5 Powers of the arbitrator; 14.3.6 Third party procedure; 14.4 Legal proceedings; 14.5 Summary;.

Appendix A Intermediate Named Sub-Contractor Tender and Agreement (ICSub/NAM/IT), (ICSub/NAM/T), (ICSub/NAM/A); Appendix B Intermediate Named Sub-Contract Conditions (ICSub/NAM/C);Appendix C Intermediate Named Sub-Contractor/Employer Agreement; (ICSub/NAM/E); Table of Cases; Clause Number Index to Text; Subject Index.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 5335
若需訂購本書,請電洽客服 02-25006600[分機130、131]。

暢銷榜

客服中心

收藏

會員專區