Guidelines For Design Solutions For Process Equipment Failures
商品資訊
ISBN13:9780816906840
出版社:John Wiley & Sons Inc
作者:Ccps
出版日:1998/08/01
裝訂/頁數:精裝/252頁
規格:24.1cm*16.5cm*1.9cm (高/寬/厚)
商品簡介
Special Details: Hardcover book plus 3.5" diskette for use in any word processing program with design solutions for use in PHAs.
作者簡介
目次
Preface.
Acknowledgment.
1. Introduction.
1.1 Objectives.
1.2 Scope.
1.3 Background.
1.4 Applicability and Audience.
1.5 Organization of This Book.
1.6 References.
Suggested Additional Reading.
2. Technique for Selecting the Design Bases for Process Safety Systems.
2.1 Risk-Based Design Decisions.
2.2 The Concept of Risk.
2.3 Selection of Design Bases for Safety Systems.
2.3.1 Step 1: Identify Failure Scenarios.
2.3.2 Step 2: Estimate the Consequences.
2.3.3 Step 3: Determine Tolerability of Consequences.
2.3.4 Step 4: Estimate Likelihood and Risk.
2.3.5 Step 5: Determine Tolerability of Risk.
2.3.6 Step 6: Consider Enhanced and/or Alternative Design.
2.3.7 Step 7: Evaluate Enhancements and/or Alternatives.
2.3.8 Step 8: Determine Tolerability of Risk and Cost.
2.3.9 Step 9: Document Results.
2.4 Guidelines for Risk Tolerability.
2.5 Potential Process Safety Systems Design Solutions.
2.5.1 Four Categories of Design Solutions.
2.5.2 Characteristics of Design Solutions Categories.
2.6 Applying the Risk-Based Design Bases Selection Technique.
2.6.1 Locking Open a Valve (a Simple Design Case).
2.6.2 Selecting the Relief System Basis for a Reactor (a Complete Design Case).
2.7 References.
Suggested Additional Reading.
3. Vessels.
3.1 Introduction.
3.2 Past Incidents.
3.2.1 Storage Tank Autopolymerization Incident.
3.2.2 Storage Tank Stratification Incident.
3.2.3 Batch Pharmaceutical Reactor Accident.
3.3 Failure Scenarios and Design Solutions.
3.4 Discussion.
3.4.1 Use of Potential Design Solutions Table.
3.4.2 Special Considerations.
3.5 References.
Suggested Additional Reading.
Table 3. Failure Scenarios for Vessels.
4. Reactors.
4.1 Introduction.
4.2 Past Incidents.
4.2.1 Seveso Runaway Reaction.
4.2.2 3,3-Dichloroaniline Autoclave Incident.
4.2.3 Continuous Sulfonation Reaction Explosion.
4.3 Failure Scenarios and Design Solutions.
4.4 Discussion.
4.4.1 Use of Potential Design Solutions Table.
4.4.2 General Discussion.
4.4.3 Special Considerations.
4.5 References.
Suggested Additional Reading.
Table 4. Failure Scenarios for Reactors.
5. Mass Transfer Equipment.
5.1 Introduction.
5.2 Past Incidents.
5.2.1 Distillation Column Critical Concentration.
5.2.2 Ethylene Purifier Vessel Rupture.
5.2.3 Ignition of Pyrophoric Materials in Gasoline Fractionator.
5.3 Failure Scenarios and Design Solutions.
5.4 Discussion.
5.4.1 Use of Potential Design Solutions Table.
5.4.2 Special Considerations.
5.5 References.
Suggested Additional Reading.
Table 5. Failure Scenarios for Mass Transfer Equipment.
6. Heat Transfer Equipment.
6.1 Introduction.
6.2 Past Incidents.
6.2.1 Ethylene Oxide Redistillation Column Explosion.
6.2.2 Brittle Fracture of Heat Exchanger.
6.2.3 Cold Box Explosion.
6.3 Failure Scenarios and Design Solutions.
6.4 Discussion.
6.4.1 Use of Potential Design Solutions Table.
6.4.2 Special Considerations.
6.5 References.
Suggested Additional Reading.
Table 6. Failure Scenarios for Heat Transfer Equipment.
7. Dryers.
7.1 Introduction.
7.2 Past Incidents.
7.2.1 Drying a Compound Fertilizers.
7.2.2 Fires In Cellulose Acetate Dryer.
7.2.3 Pharmaceutical Powder Dryer Fire and Explosion.
7.3 Failure Scenarios and Design Solutions.
7.4 Discussion.
7.4.1 Use of Potential Design Solutions Table.
7.4.2 Special Considerations.
7.5 References.
Suggested Additional Reading.
Table 7 Failure Scenarios for Dryers.
8. Fluid Transfer Equipment.
8.1 Introduction.
8.2 Past Incidents.
8.2.1 Reciprocating Pump Leak.
8.2.2 Pump Leak Fire.
8.2.3 Compressor Fire and Explosion.
8.2.4 Start-up of Parallel Centrifugal Pumps.
8.3 Failure Scenarios and Design Solutions.
8.4 Discussion.
8.4.1 Use of Potential Design Solutions Table.
8.4.2 Special Considerations.
8.5 References.
Suggested Additional Reading.
Table 8. Failure Scenarios for Fluid Transfer Equipment.
9. Solid-Fluid Separators.
9.1 Introduction.
9.2 Past Incidents.
9.2.1 Batch Centrifuge Explosion.
9.2.2 Filter Explosion.
9.2.3 Dust Collector Explosion.
9.3 Failure Scenarios and Design Solutions.
9.4 Discussion.
9.4.1 Use of Potential Design Solutions Table.
9.4.2 Special Considerations.
9.5 References.
Suggested Additional reading.
Table 9. Failure Scenarios for Solid-Fluid Separators.
10. Solids Handling and Processing Equipment.
10.1 Introduction.
10.2 Past Incidents.
10.2.1 Silicon Grinders Fire and Explosion.
10.2.2 Blowing Agent Blender Operation Explosion Incident.
10.2.3 Screw Conveyor Explosion.
10.2.4 Bucket Elevator Explosion.
10.3 Failure Scenarios and Design Solutions.
10.4 Discussion.
10.4.1 Use of Potential Design Solution Table.
10.4.2 General Discussion.
10.4.3 Special Considerations.
10.5 References.
Suggested Additional Reading.
Table 10. Failure Scenarios for Solids Handling and Processing Equipment.
11. Fired Equipment.
11.1 Introduction.
11.2 Past Incidents.
11.2.1 Light-Off Error.
11.2.2 Ethylene Cracking Furnace Overfiring.
11.2.3 Furnace Tube Failure.
11.3 Failure Scenarios and Design Solutions.
11.4 Discussion.
11.4.1 Use of Potential Design Solutions Table.
11.4.2 Special Considerations.
11.5 References.
Suggested Additional Reading.
Table 11. Failure Scenarios for Fired Equipment.
12. Piping and Piping Components.
12.1 Introduction.
12.2 Past Incidents.
12.2.1 Fixborough Expansion Joint Failure.
12.2.2 Chemical Storage Terminal Fire.
12.2.3 Line Pluggage.
12.2.4 External Corrosion.
12.3 Failure Scenarios and Design Solutions.
12.4 Discussion.
12.4.1 Use of Potential Design Solutions Table.
12.4.2 Special Considerations.
12.5 References.
Suggested Additional Reading.
Table 12. Failure Scenario for Piping and Piping Components.
Appendix A. Example Problem: Batch Chemical Reactor.
Appendix B. Example Problem: Distillation System.
Glossary.
Acronyms and Abbreviations.
Index.
主題書展
更多書展購物須知
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

