TOP
0
0
【簡體曬書區】 單本79折,5本7折,活動好評延長至5/31,趕緊把握這一波!
Audel Managing Shutdowns, Turnarounds, And Outages
滿額折

Audel Managing Shutdowns, Turnarounds, And Outages

定  價:NT$ 1400 元
優惠價:901260
領券後再享88折
無庫存,下單後進貨(到貨天數約30-45天)
可得紅利積點:37 點
相關商品
商品簡介
作者簡介
目次

商品簡介

Don't shut down by accident

A carefully planned shutdown will improve your plant's safety and efficiency, while one that "just happens" can be disastrous. Developed from the author's highly successful seminars, this book takes you step by step through successfully managing production shutdowns. Identify what must be done, schedule equipment and staff, use project-management software, and save both dollars and downtime.
* Prioritize needs and identify what can be accomplished within time and budget constraints
* Determine whether outside help is required
* Schedule the order and priority of projects
* Learn to use CPM (Critical Path Methods) or PERT (Program Evaluation Review Technique)
* Plan for new or additional work that may arise during a shutdown
* Report and document preparation and execution
* Identify and record future needs the shutdown reveals

作者簡介

Michael V. Brown has held maintenance management positions and advised Fortune 500 companies. As a founder and President of New Standard Institute, he has designed and implemented maintenance management programs for a diverse group of clients.

目次

About the Author.

Introduction.

Chapter 1: Identifying the Work.

Identifying the Work.

Risk Management.

Defining and Limiting the Scope.

Summary.

Chapter 2: Planning the Work.

Planning the Shutdown.

Planning Thought Process.

Estimating Tips.

Work Packages.

Contracts for Services.

Summary.

Chapter 3: Scheduling the Work.

Critical Path Method (CPM).

Program Evaluation and Review-Technique (PERT).

The Monte Carlo Method.

Project Management Software.

Summary.

Chapter 4: Executing the Project.

Shutdown Safety.

OSHA Requirements.

Developing Daily Schedules.

Updating Job Status.

Reporting Project Status.

Tracking Project Costs.

Summary.

Chapter 5: Reporting and Documenting the Shutdown Activity.

Project Review Meeting.

Project File.

Final Report.

Sample Shutdown Report.

Summary.

Appendix A: Boiler Shutdown Example.

Boiler History.

The Shutdown.

Identifying the Work.

Building the Work List.

Appendix B: Identifying Electrical Work to Be Performed During a Shutdown.

Electrical Shutdown Checklist.

Appendix C: Machinery Inspection Prior to and During a Shutdown.

Bearing Data.

Shaft Alignment Standards.

Gear Drive Inspection Standards.

V-Belt Drives.

Pumps and Mechanical Seals.

Fans.

Glossary.

Index.

您曾經瀏覽過的商品

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 1260
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區