TOP
月月讀書金,登入即領,滿600現折50!!
A BIM-Enabled FM Concept and Its Effects on the Preparation of the Tendering Process for a General Contractor
滿額折

A BIM-Enabled FM Concept and Its Effects on the Preparation of the Tendering Process for a General Contractor

商品資訊

定價
:NT$ 2827 元
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點 :84 點
商品簡介

商品簡介

Master's Thesis from the year 2019 in the subject Engineering - Civil Engineering, grade: 2,3, Technical University of Berlin, language: English, abstract: This case study investigated a BIM-enabled FM concept within a construction project, which took place during the phase of the tendering preparation. The study asked for the requirements and preconditions in the concept, why they have been defined and examined their effects on the tendering preparation. Next to eight use cases, several necessities regarding the future O&M software, like a BCF support or the compatibly with certain software formats, it was found that the dealing with the integration of BIM in FM, disclosed inefficient customer processes and documents. As a highlight an efficient, risk minimizing documentation process, is described. The web-based process uses a plant classification code, to automatically link uploaded handover documents with corresponding model elements and offers the possibility to continuously perform the handover. The process is seen as a good possibility to increase the handover quality and to reduce the associated risk resulting out of inadequate and lacking documentations.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 2827
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區