TOP
經典不再等待!讀懂羅馬人的強大,開啟你的智力冒險
Decoding Reliability-Centered Maintenance Process for Manufacturing Industries: 10th Discipline on World Class Maintenance Management

Decoding Reliability-Centered Maintenance Process for Manufacturing Industries: 10th Discipline on World Class Maintenance Management

商品資訊

定價
:NT$ 4319 元
若需訂購本書,請電洽客服 02-25006600[分機130、131]。
無法訂購
商品簡介

商品簡介

  • There are cases where breakdowns and failures are not the primary cause of equipment downtime, especially in manufacturing industries. Although RCM is a popular strategy, still many manufacturing industries are not implementing this process and continue to remain stuck in their PM tasks. The main reason why I wrote this book is that doing RCM in a manufacturing plant is a bit different from doing RCM in oil and gas, power plants, and other similar plants because their equipment losses are different, although the process on how RCM is done will be the same. If you worked in a semi-conductor plant, breakdowns and failures are not the main issues, but minor-stoppages, changeover, or quality problems are. You must know the boundary between what RCM can address and what it cannot. RCM will address failures and breakdowns by proposing tasks; it is not designed to address every possible equipment loss. What I am saying is that failures are just a subset of the entire equipment losses. Suppose you have chronic quality problems caused by the equipment; RCM can address some of them, but not all, since Quality problems and defects are much broader than breakdown and failures. I have a detailed explanation of what particular losses RCM can and cannot address in Chapter 3.3.2 of this book. This book is written to help industries implementing RCM on their machines, equipment, and assets. Some of the highlights of this book includes:
  • 27 Frequently Asked Questions (FAQ) on RCM
  • 22 Tips on Implementing RCM- 15 Don'ts About RCM
  • Why the RCM Preparatory Stage is Important
  • Can RCM Address All Equipment Losses?
  • Actual Case Study on RCM
  • How to Integrate RCM into the TPM Process
  • Bonus: RCM Forms I used in Excell Format
  • The RCM and TPM Crossroads-
  • Strenghtening the SAE JA1011 Criteria
  • Addressing MRO Spare Parts after Implementing RCM
  • How to Determine the Correct Interval for PM, PdM, FFT, and Switching Standby Components
  • MRO Decision Diagram on Whether to Stock or Not to Stock
  • Difference Between a Failure Mode and a Root Cause
  • Secondary Tasks for Doing On-Condition Tasks
  • Details in Writing the RCM Decision Worksheet Explained
  • Details in Writing the RCM Information Worksheet Explained
  • Details in performing Horizontal Replication for Similar Equipment with the Same Operating Context
  • Details in Conducting the RCM Audit
  • And more . . .


  • In this book, I have explained two definitions of RCM, which is looking on the equipment side and the human side of doing it. Reliability-Centered maintenance is a process used to determine any physical asset's maintenance tasks, decisions, and requirements in its current or present operating context. It is also a process used to determine what must be done to ensure that any physical assets continue to do whatever their users want them to do in their present operating context. On the human and softer definition, RCM is a way or process of capturing and extracting the knowledge, understanding, and wisdom of the most experienced people in the plant and transforming it into a living document and their legacy. In most cases, when these good old folks go away and retire for good, they bring everything they know to their grave, and the plant hires fresh employees with little or no experience and starts everything from the very beginning. We just want to put a stop to this never-ending cycle.I have also explained in this book how to implement RCM more successfully by restoring the equipment first. If the plant is implementing Total Productive Maintenance, the integration of these two methodologies is explained in detail in this book.


購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 4319
若需訂購本書,請電洽客服 02-25006600[分機130、131]。

暢銷榜

客服中心

收藏

會員專區