TOP
Assessing Factors Affecting Project Performance of Local Constructors

Assessing Factors Affecting Project Performance of Local Constructors

商品資訊

定價
:NT$ 2880 元
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點 :86 點
商品簡介

商品簡介

The problem of project performance in the construction sector is a global phenomenon and Zambia's construction industry has not been spared. This work seeks to investigate the factors that are affecting project performance by local constructors in Zambia.The Iron Triangle was used as a theoretical under pinning to the work. This is so because any successful quality of a project or outcome, the project manager needs to balance between the triple constraints.The research adopted the descriptive research design because it tried to describe the actual factors affecting project performance by local constructors. Since both qualitative and quantitative data was sort, a mixed method research design was employed to be specific the convergent parallel design was used.The study concluded that for most of the project undertaken in Choma by the local constructors lack the supervision of qualified consultants attached to the project, as such there is no professional or expert advice to local constructors on the costing, timing and quality of the project.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 2880
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區