TOP
紅利積點抵現金,消費購書更貼心
Reusability of Gslv Mk III Solid Boosters Using Falcon 9

Reusability of Gslv Mk III Solid Boosters Using Falcon 9

商品資訊

定價
:NT$ 3060 元
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點 :91 點
商品簡介

商品簡介

Advancements in global space launch technology call for India's launch vehicles to become more reusable and versatile. This project proposes redesigning the GSLV Mk3 by replacing S200 solid boosters with reusable LOX/kerosene boosters and adding boost-back and vertical landing to the first stage. The second stage is optimized for partial or full recovery, while the C25 cryogenic upper stage is upgraded for better efficiency to support GTO, LEO, and interplanetary missions. Calculations cover thrust, mass ratios, specific impulse, gravity and drag losses, and overall Δv budgets. Trajectory simulations using GPOPS-II optimize ascent profiles and reduce performance losses. Structural analysis ensures vehicle integrity under aerodynamic and re-entry stresses. Focus is on lightweight materials, improved thermal protection, and aerodynamic control for precision landing. This redesign aims to lower costs, increase launch frequency, and expand ISRO's mission capabilities. Challenges include thermal management, hypersonic control, and landing reliability. The project envisions next-generation Indian launch vehicles with global competitiveness and sustainable space access.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 3060
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區