This book provides guidance to those with responsibility for scheduling and executing a Pre-Startup Safety Review (PSSR). It outlines a protocol and tool for use by project or turnaround teams, to effectively and efficiently schedule and execute a PSSR.
Integrates PSSR throughout the project/turnaround phases, with a verification check at the traditional PSSR step
Supports a "right first time" and "check only once" project philosophy to eliminate surprises
Features how-to checklists, hazard assessment, batch and continuous processes, validation, and documentation
Includes a CD with PSSR checklists and PSSR management system examples.
Note: CD-ROM/DVD and other supplementary materials are not included as part of eBook file.

作者簡介

Since 1985, the Center for Chemical Process Safety (CCPS) has been the world leader in developing and disseminating information on process safety management and technology. CCPS, an industry technology alliance of the American Institute of Chemical Engineers (AIChE), has published over 80 books in its process safety guidelines and process safety concepts series.

目次

List of Tables.
List of Figures.
Items on the CD Accompanying This Book.
Acronyms and abbreviations.
Glossary.
Acknowledgements.
Preface.
1. Introduction.
1.1 What are the Benefits of Performing Pre-startup Safety Reviews?
1.2 How PSSR Relates to Other Process Safety Elements.
1.3 An Overview of the Risk-based Approach to PSSR.
1.4 What is the Scope of a PSSR? Process Safety, Environmental, Quality and Personnel Safety Considerations.
1.5 This Guideline’s Audience.
1.6 How to use this Guideline.
1.7 References.
2. What Is a Pre-Startup Safety Review?
2.1 The Basics of Pre-startup Safety Review.
2.1.1 Some Common Steps for Performing PSSR.
2.2 What is a Risk-based Approach to PSSR?
2.3 The Role of Training in Pre-startup Safety Review.
2.3.1 Training Team Leaders and Members.
2.3.2 Training Managers and the Remaining Workforce.
2.4 Scheduling Considerations.
2.4.1 Capital Projects.
2.4.2 Changes to Operating Facilities.
2.4.3 Temporary Changes.
2.4.4 Restarting a Mothballed Process.
2.4.5 Post-turnaround Startup.
2.4.6 Routine Maintenance.
2.4.7 Startup After Emergency Shutdown.
2.5 References.
3. Regulatory Issues.
3.1 An Overview of PSSR Industry Guidelines and Regulations.
3.2 Best Practices for PSSR.
3.3 Environmental Considerations.
3.4 General Safety, Security, and Occupational Health Considerations.
3.5 References.
4. A Risk-Based Approach to Pre-Startup Safety Review.
4.1 Using Risk Analysis Techniques to Select the Level of Detail for a PSSR.
4.1.1 A Case of Complexity Versus Simplicity.
4.1.2 The Term Complexity Includes Novelty.
4.1.3 The Effect of Complexity on PSSR Team Size and Expertise.
4.1.4 The Effect on the Level and Scope of the Review.
4.2 A Decision Guideline for Designing a PSSR.
4.2.1 A Definition of Risk-based PSSR. A Qualitative Approach.
4.2.2 An Example Algorithm.
4.3 Typical Considerations for all Pre-startup Safety Reviews.
4.3.1 Hardware and Software: Equipment, Instrumentation, and Process Control.
4.3.2 Documentation: Process Safety Information, Procedures, and Maintenance Management System Data.
4.3.3 Training: Quality and Verification of Completeness.
4.3.4 Special Items: Specific Safety, Health, and Environmental Issues.
4.4 An Example Risk-based Questionnaire.
4.5 Two Examples of Using a Risk-based Approach to PSSR Design.
4.5.1 A Simple PSSR.
4.5.2 A More Complex PSSR.
4.6 References.
5. The Pre-Startup Safety Review Work Process.
5.1 Defining the PSSR System.
5.1.1 Double Checking Management of Change.
5.1.2 Who Is Responsible for Driving the System?
5.2 PSSR Sub-elements.
5.2.1 Construction and equipment meet the designed specifications.
5.2.2 Safety, operating, maintenance and emergency procedures are in place and adequate.
5.2.3 A PHA has been performed for new facilities.
5.2.4 Training of each employee involved in the process is complete.
5.2.5 General requirements.
5.3 Designing and Implementing an Initial PSSR Program.
5.3.1 Defining a Policy on PSSR.
5.3.2 Defining the PSSR Team.
5.3.3 Designing the Specific PSSR.
5.3.4 Training the Workforce on the PSSR Program.
5.3.5 An Example PSSR Program.
5.4 Preparing to Perform a Pre-statup Safety Review.
5.4.1 Gather the Documentation.
5.4.2 Schedule Meetings as Needed.
5.4.3 Verify the Trigger Event Related Work Is Complete.
5.4.4 Identify and Track the Process Hazard Analysis Action Items.
5.5 Follow Pre-startup Safety Review Action Items.
5.5.1 Which Items Are Critical for Safe Operation?
5.5.2 Consider Past PSSR PSM Compliance Audit Findings.
5.6 Approve the Pre-startup Safety Review Report.
5.6.1 Reference the Documentation: Electronic or Hardcopy.
5.6.2 PSSR Team Approval.
5.6.3 Management Approval.
5.7 References.
6. Methodologies for Compiling and Using A PSSR Checklist.
6.1 Building Your Facility’s Database of Questions.
6.1.1 Beware of Shortcuts.
6.1.2 Considerations for Different Industries.
6.2 Various Approaches: Electronic versus Hardcopy.
6.2.1 Using your Existing Facility Action Item Tracking System.
6.2.2 Basic Electronic PSSR Checklist Tools.
6.2.3 Electronic Change Management Systems with PSSR Tools.
6.3 An Example Electronic Checklist.
6.3.1 Collapse the Checklist for Simple PSSR.
6.3.2 Expand the Checklist for Complex PSSR.
7. Continuous Improvement.
7.1 Diagnosing PSSR System Issues.
7.2 Training and Communication.
7.3 Examine Excesses as well as Deficiencies.
7.4 Why Refine, Improve, Upgrade, or Redesign?
7.4.1 Workforce Reductions.
7.4.2 Company Restructuring.
7.4.3 Acquisitions, Mergers, and Divestiture.
7.4.4 Regulatory Changes.
7.4.5 Changes in Process Risk.
7.5 Upgrading the System.
7.6 Example PSSR Performance and Efficiency Metrics.
7.6.1 PSSR Performance Indicators.
7.6.2 PSSR Efficiency Indicators.
7.7 Audit Frequency.
7.8 Qualification Considerations for PSSR Auditors.
7.9 Sample PSSR Audit Protocols.
7.10 Addressing Audit Results.
7.11 Summary.
7.12 References.
Appendix A. PSSR Checklist Examples.
Appendix B. Industry References.
Appendix C. Regulatory References.
Index.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 8143
若需訂購本書,請電洽客服 02-25006600[分機130、131]。

暢銷榜

客服中心

收藏

會員專區