The Jct Design And Build Contract 2005 3E
商品資訊
ISBN13:9781405159241
出版社:John Wiley & Sons Inc
作者:Chappell
出版日:2007/06/04
裝訂/頁數:精裝/288頁
定價
:NT$ 6497 元優惠價
:
90 折 5847 元
若需訂購本書,請電洽客服 02-25006600[分機130、131]。
無法訂購
商品簡介
作者簡介
名人推薦
目次
商品簡介
The Joint Contracts Tribunal issued a new Design and Build Form in 2005, a successor to the JCT Standard Form of Building Contract with Contractor's Design. It looks substantially different from its predecessor and it is different in structure and often in its wording.
This major new edition of David Chappell's well regarded book has been substantially revised to take account of the new contract terms and different structure. It also considers the standard novation agreements from the CIC and City of London Law Society and more then 70 additional cases. It discusses areas where problems frequently arise:
the allocation of design responsibility
discrepancies
the role of the employer's agent
payment provisions
the approval of drawings
This major new edition of David Chappell's well regarded book has been substantially revised to take account of the new contract terms and different structure. It also considers the standard novation agreements from the CIC and City of London Law Society and more then 70 additional cases. It discusses areas where problems frequently arise:
the allocation of design responsibility
discrepancies
the role of the employer's agent
payment provisions
the approval of drawings
作者簡介
David Chappell BA(Hons Arch), MA(Arch), MA(Law), PhD, RIBA has worked as an architect in the public and private sectors and is currently the Director of David Chappell Consultancy Ltd. He frequently acts as an adjudicator and is author of ten books on construction law for Blackwell Publishing.
名人推薦
"A thoroughly good read and exceptionally good guidance on the latest JCT design and build contact. I would thoroughly recommend this book to any of the parties for whom it was intended." (Expert and Dispute Resolver, Winter 2008)
"an immensely competent book which every site owner and contractor should read before entering into the contract" (Construction Law Digest)
"well illustrated and easy to read" (Chartered Surveyor Monthly)
"an enjoyable and essential read for professionals and lawyers involved in design & build" (Building Magazine)
"a first rate commentary on JCT 98 With Contractor's Design." (Construction Law)
"an immensely competent book which every site owner and contractor should read before entering into the contract" (Construction Law Digest)
"well illustrated and easy to read" (Chartered Surveyor Monthly)
"an enjoyable and essential read for professionals and lawyers involved in design & build" (Building Magazine)
"a first rate commentary on JCT 98 With Contractor's Design." (Construction Law)
目次
Preface.
1. INTRODUCTION.
1.1 Definitions.
1.2 Advantages and disadvantages.
1.3 The architect's role.
1.4 Standard forms available.
1.5 Tendering procedures.
2. CONTRACT DOCUMENTS.
2.1 The documents.
2.2 Completing the form.
2.3 Employer's Requirements.
2.4 Contractor's proposals.
2.5 Contract sum analysis.
2.6 Supplementary provisions.
2.7 Priority, discrepancies, errors.
2.8 Custody and copies.
2.9 Notices.
3. DESIGN LIABILITY.
3.1 General principles of design liability.
3.2 Liability under the contract.
3.3 Design liability optional arrangements and consequences.
3.4 Consultant switch and novation.
3.5 Novation agreements.
3.6 In house or sub let.
3.7 Consultant warranties.
4. THE CONTRACTOR'S OBLIGATIONS.
4.1 Express and implied terms.
4.2 Implied terms.
4.3 Express terms.
4.4 Other obligations.
5. THE EMPLOYER'S POWERS AND DUTIES.
5.1 Employer's agent.
5.2 Express and implied terms.
5.3 Instructions.
5.4 Powers.
5.5 Employer's duties.
6. SUB CONTRACTORS AND SUPPLIERS.
6.1 General.
6.2 Sub contractors.
6.3 Statutory requirements.
6.4 The Construction (Design and Management) Regulations 2007.
6.5 Work not forming part of the contract.
6.6 Third party rights and collateral warranties.
7. POSSESSION, PRACTICAL COMPLETION AND RECTIFICATION.
7.1 Possession and deferment.
7.2 Progress.
7.3 Practical completion.
7.4 Partial possession.
7.5 Defects liability period.
8. EXTENSION OF TIME.
8.1 Principles.
8.2 Contract procedure.
8.3 Relevant events.
8.4 Liquidated damages.
9. FINANCIAL CLAIMS.
9.1 Types of claim.
9.2 Application for direct loss and/or expense.
9.3 Supplementary provision procedures (S7).
9.4 Grounds for direct loss and/or expense.
9.5 Antiquities.
10. PAYMENT.
10.1 The contract sum.
10.2 Interim payments.
10.3 Applications.
10.4 Employer's right to withhold payment or to deduct.
10.5 Retention.
10.6 Final payment.
10.7 Advance payment.
10.8 Changes.
10.9 Valuation of changes under the supplementary provisions.
10.10 Fluctuations.
10.11 VAT.
11. INSURANCE AND INDEMNITIES.
11.1 Injury to persons and property.
11.2 Employer's liability.
11.3 Insurance of the Works.
11.4 Insurance of the Works: new building.
11.5 Insurance of the Works: existing building.
11.6 Terrorism cover.
11.7 The Joint Fire Code.
11.8 Professional indemnity insurance.
12. TERMINATION.
12.1 Common law position.
12.2 Termination generally.
12.3 Termination by the employer.
12.4 Termination by the contractor.
12.5 Termination by either party.
13. DISPUTE RESOLUTION.
13.1 Introduction.
13.2 Adjudication.
13.3 Arbitration.
13.4 Litigation.
Table of cases.
Clause index.
Subject index.
1. INTRODUCTION.
1.1 Definitions.
1.2 Advantages and disadvantages.
1.3 The architect's role.
1.4 Standard forms available.
1.5 Tendering procedures.
2. CONTRACT DOCUMENTS.
2.1 The documents.
2.2 Completing the form.
2.3 Employer's Requirements.
2.4 Contractor's proposals.
2.5 Contract sum analysis.
2.6 Supplementary provisions.
2.7 Priority, discrepancies, errors.
2.8 Custody and copies.
2.9 Notices.
3. DESIGN LIABILITY.
3.1 General principles of design liability.
3.2 Liability under the contract.
3.3 Design liability optional arrangements and consequences.
3.4 Consultant switch and novation.
3.5 Novation agreements.
3.6 In house or sub let.
3.7 Consultant warranties.
4. THE CONTRACTOR'S OBLIGATIONS.
4.1 Express and implied terms.
4.2 Implied terms.
4.3 Express terms.
4.4 Other obligations.
5. THE EMPLOYER'S POWERS AND DUTIES.
5.1 Employer's agent.
5.2 Express and implied terms.
5.3 Instructions.
5.4 Powers.
5.5 Employer's duties.
6. SUB CONTRACTORS AND SUPPLIERS.
6.1 General.
6.2 Sub contractors.
6.3 Statutory requirements.
6.4 The Construction (Design and Management) Regulations 2007.
6.5 Work not forming part of the contract.
6.6 Third party rights and collateral warranties.
7. POSSESSION, PRACTICAL COMPLETION AND RECTIFICATION.
7.1 Possession and deferment.
7.2 Progress.
7.3 Practical completion.
7.4 Partial possession.
7.5 Defects liability period.
8. EXTENSION OF TIME.
8.1 Principles.
8.2 Contract procedure.
8.3 Relevant events.
8.4 Liquidated damages.
9. FINANCIAL CLAIMS.
9.1 Types of claim.
9.2 Application for direct loss and/or expense.
9.3 Supplementary provision procedures (S7).
9.4 Grounds for direct loss and/or expense.
9.5 Antiquities.
10. PAYMENT.
10.1 The contract sum.
10.2 Interim payments.
10.3 Applications.
10.4 Employer's right to withhold payment or to deduct.
10.5 Retention.
10.6 Final payment.
10.7 Advance payment.
10.8 Changes.
10.9 Valuation of changes under the supplementary provisions.
10.10 Fluctuations.
10.11 VAT.
11. INSURANCE AND INDEMNITIES.
11.1 Injury to persons and property.
11.2 Employer's liability.
11.3 Insurance of the Works.
11.4 Insurance of the Works: new building.
11.5 Insurance of the Works: existing building.
11.6 Terrorism cover.
11.7 The Joint Fire Code.
11.8 Professional indemnity insurance.
12. TERMINATION.
12.1 Common law position.
12.2 Termination generally.
12.3 Termination by the employer.
12.4 Termination by the contractor.
12.5 Termination by either party.
13. DISPUTE RESOLUTION.
13.1 Introduction.
13.2 Adjudication.
13.3 Arbitration.
13.4 Litigation.
Table of cases.
Clause index.
Subject index.
主題書展
更多
主題書展
更多書展購物須知
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。