Through this knowledge-based approach, construction teams can successfully resolve and learn from change events, leading to an overall improved performance of the industry.
The book will make a significant contribution to our understanding of construction project change by offering new theoretical and practical insights and models grounded in results of case studies conducted within two collaborative construction project team settings.
By demonstrating how the social construction of knowledge works in construction settings, the authors challenge the prevailing change management solutions based on ‘hard’ IT approaches. They put forward a balanced view that incorporates both IT–based and socially constructed approaches to effective management of construction project change.
• helps construction managers to improve and learn through the process of construction project change
• presents new theoretical models and offers practical guidelines
• first research-based book to directly address project change from a knowledge-based perspective
• draws on detailed studies with construction companies, including Ballast Construction and Kier Construction.
• encourages a move from the information driven, process integrated approach to a knowledge-based view
Professor Martin Sexton, Director of Research, School of Construction Management and Engineering, University of Reading, UK
Chapter 1 Introduction.
1.1 Background.
1.2 Need for the Investigation.
1.3 Questions to Research.
1.4 Summary and Link.
Chapter 2 Key Issues from the Literature.
2.1 Introduction.
2.2 Construction Project Environment.
2.3 Construction Project Change Management.
2.4 Knowledge Management Perspective.
2.5 Role of Knowledge During Reactive Change Process.
2.6 Towards a Knowledge-Based Reactive Change Process.
2.7 Summary and Link.
Chapter 3 Research Methodology.
3.1 Introduction.
3.2 Case Study Research Design.
3.3 Data Collection Process.
3.4 Data Analysis Process.
3.5 Summary and Link.
Chapter 4 Case Study Results.
4.1 Introduction.
4.2 Case Study: Project A.
4.3 Case Study: Project B.
4.4 Summary and Link.
Chapter 5 Cross-Case Analysis.
5.1 Introduction.
5.2 Contextual Factors of Change: P1 Discussion.
5.3 Knowledge Properties During Change: P2 Discussion.
5.4 Knowledge Identification and Utilisation During
Change: P3 Discussion.
5.5 Intra-Project Knowledge Creation During Change:
P4 Discussion.
5.6 Inter-Project Knowledge Transfer During Change:
P5 Discussion.
5.7 Summary and Link.
Chapter 6 Conclusions.
6.1 Introduction.
6.2 Summary of Propositions.
6.3 Comment on the Conceptual Model.
6.4 Conclusions about the Overall Research Problem.
6.5 Implications for Theory.
6.6 Implications for Practice.
Appendix A Interview Guidelines.
Appendix B Example of an Interview Transcript.
Appendix C Comparison Between Propositions and Codes.
References.
Index.
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。