TOP
Force Majeure in the Hydropower Industry: Concepts and Case Studies
滿額折

Force Majeure in the Hydropower Industry: Concepts and Case Studies

商品資訊

定價
:NT$ 3189 元
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點 :95 點
商品簡介

商品簡介

This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The hydropower field is under increasing pressure. Consumer requirements and expectations are growing, and energy producers and suppliers need to find solutions that meet expectations. However, there are unforeseen situations that make it impossible to meet deadlines, with delays, economic and material losses or even the cancellation of contracts and penalties. Global climate change, by exacerbating extreme phenomena, is increasingly causing imbalances in electricity production. At the same time, the prediction of these phenomena with an increased accuracy makes the events no longer even unpredictable. In such a situation, drafting a contract between the parties to protect in the event of an unusual situation that would lead to non-compliance with the contractual provisions is more than necessary. The exemplification of concrete situations of drafting, invoking and resolving such disputes can help to solve future contractual problems in this field.

The first part of the book will be an analysis of how water is used in electricity production. It is important to point out that all types of energy sources use water, to a different extent, of course, and that its spatial and temporal availability is very important. The focus will be on hydropower, presenting the current situation at the global level, and the effect of reducing the amounts of water in the river system.

The second part is based on the presentation of the concept of force majeure and the ways of presenting and drafting it in a contract. Many disputes or the success of a contract depended heavily on the provisions of this article of the contract. Obviously, there are also situations in which the signatory parties abuse or are not protected by these provisions of force majeure. Starting from a few brief examples from the international level, we reach a wide discussion of the situation created in Romania, when the largest supplier of electricity produced on the basis of water terminates several contracts invoking force majeure. The manner in which the opinion of the parties involved is presented to the court is analyzed and presented in detail.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 3189
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區