TOP
紅利積點抵現金,消費購書更貼心
Guidelines For Safe Process Operations And Maintenance
滿額折

Guidelines For Safe Process Operations And Maintenance

商品資訊

定價
:NT$ 7497 元
優惠價
906747
若需訂購本書,請電洽客服 02-25006600[分機130、131]。
商品簡介
作者簡介
目次

商品簡介

First-line managers have to maintain the integrity of facilities, control manufacturing processes, and handle unusual or emergency situations, as well as respond to the pressures of production demand. On a daily basis, they are closest to the operating personnel who may be injured by a process accident, and they are in the best position to spot problem conditions and to act to contain them. This book offers these managers "how-to" information on process safety management program execution in the operations and maintenance departments, recommending technical and administrative process safety activities for the entire life cycle of the plant. Helpful tables and references add to the value of this process safety resource.

作者簡介

The CENTER FOR CHEMICAL PROCESS SAFETY (CCPS), an industry technology alliance of the American Institute of Chemical Engineers (AIChE), has been a world leader in developing and disseminatinginformation on process safety management and technology since 1985. CCPS has published over 80 books in its process safety guidelines and process safety concepts series. For more information, visit www.ccpsonline.org.

目次

Preface.

Acknowledgments.

List of Tables.

List of Figures.

Glossary.

1. INTRODUCTION.

1.1 Process Safety Management Activities of the Center for Chemical Process Safety (CCPS).

1.2 Process Safety Activities of Governmental Agencies and Trade Organizations.

1.3 Target Audience and Objective of This Document.

1.4 Use of This Document.

1.5 References.

2. ROLE OF OPERATIONS AND MAINTENANCE IN PROCESS SAFETY MANAGEMENT.

2.1 Accountability.

2.2 Process Knowledge and Documentation.

2.3 Capital Project Review and Design Procedures.

2.4 Process Risk Management.

2.5 Process and Equipment Integrity.

2.6 Human Factors.

2.7 Training and Performance.

2.8 Incident Investigation.

2.9 Standards, Codes, and Regulations.

2.10 Audits and Corrective Action.

2.11 Enhancement of Process Safety Knowledge.

2.12 Management of Change.

2.12.1 Importance of Changes.

2.12.2 Examples of Lessons To Be Learned from the Failure to Manage Change.

2.12.3 What Constitute Change?

2.12.4 Process Change Authorization.

2.13 Summary.

2.14 References.

3. PLANT DESIGN.

3.1 Operations and Maintenance Departments’ Roles.

3.2 Documentation.

3.3 Process Hazard Reviews.

3.4 Designing for Inherent Process Safety.

3.4.1 Process Fluids.

3.4.2 Inventory Minimization.

3.4.3 Operating and Storage Conditions.

3.5 Controlling of Hazards to Reduce Risks.

3.6 Plant Layout.

3.6.1 Site Planning.

3.6.2 Process Area Layout.

3.7 Plant Standards and Practices.

3.8 Human Factors in Plant Design.

3.9 Maintenance Considerations.

3.10 Management of Change.

3.11 References.

4. PLANT CONSTRUCTION.

4.1 Roles of the Operations and Maintenance Department.

4.1.1 Communication and Coordination with Project Team.

4.1.2 Control of Specific Construction-Related Activities.

4.1.3 Inspection of Equipment Installation.

4.2 Materials of Construction.

4.3 Custom Equipment Fabrication and Inspection.

4.4 Field Installation.

4.4.1 Piping Installation.

4.4.2 Pressure-Relief/Vent Collection.

4.4.3 Other Safety Systems.

4.5 Equipment Recordkeeping.

4.6 Summary.

4.7 References.

5. PRE-STARTUP AND COMMISSIONING.

5.1 Organization and Roles.

5.1.1 Startup Team.

5.1.2 Role of Operations and Maintenance Departments.

5.2 Planning.

5.3 Preparation for Startup.

5.3.1 Staffing Operations and Maintenance Departments.

5.3.2 Training.

5.3.3 Maintenance Activities during Pre-startup.

5.3.4 Development of Operating Procedures.

5.4 Pre-startup Safety Review.

5.5 Commissioning.

5.5.1 Commissioning Utilities.

5.5.2 Commissioning Equipment.

5.5.3 Instruments, Computer, and Control.

5.6 Final Preparations for Startup.

5.7 References.

6. STARTUP.

6.1 Roles and Responsibilities.

6.2 Initial Startup.

6.2.1 Final Preparation.

6.2.2 Introduction of Process Chemicals and Materials.

6.2.3 Process and Process Equipment Monitoring.

6.2.4 Baseline Data.

6.2.5 Updating Startup Procedures.

6.3 Restart.

6.4 Startup after Turnaround.

6.5 Startup after Extended Outage.

6.6 Resources.

6.7 Summary.

6.8 References.

7. OPERATION.

7.1 Roles and Responsibilities.

7.2 Routine Operations.

7.2.1 Operating within Process and Equipment Limits.

7.2.2 Written Procedures.

7.2.3 Communication.

7.2.4 Communication During Shift Changes.

7.2.5 Special Safety Considerations of Batch Processes.

7.2.6 Process Control Software.

7.3 Nonroutine Operations.

7.3.1 Abnormal Operations.

7.3.2 Standby Operations.

7.4 Emergency Operations.

7.5 Management of Change.

7.6 Safety Protective Systems.

7.6.1 Safety Shutdown Systems.

7.6.2 Pressure Relief Equipment.

7.7 Operator Training.

7.7.1 Refresher Training.

7.7.2 Playing “What-If” Games.

7.8 Incident Investigation.

7.8.1 Recognizing and Reporting Incidents.

7.8.2 The Investigation.

7.8.3 Investigation Results and Followup.

7.9 Human Factors.

7.9.1 Human-Process Interfaces.

7.9.2 Behavioral Issues.

7.9.3 Spontaneous Response.

7.10 Audits, Inspections, Compliance Reviews.

7.11 Summary.

7.12 References.

8. MAINTENANCE.

8.1 Roles and Responsibilities.

8.2 Routine Maintenance.

8.2.1 Preventive Maintenance.

8.2.2 Predictive Maintenance.

8.2.3 Communication between the Maintenance and Operations Departments.

8.2.4 Communication at Shift Change.

8.3 Nonroutine Maintenance.

8.3.1 Breakdown Maintenance.

8.3.2 Troubleshooting Maintenance.

8.4 Management of Change.

8.5 Aging Equipment.

8.5.1 Corrosion, Erosion, and Fatigue.

8.5.2 Wear, Intermittent Operation, and Fouling.

8.6 Critical Instrumentation and Safety Interlocks.

8.6.1 Proof Testing.

8.6.2 Critical Instrumentation and Interlock Classification.

8.7 Maintenance Training.

8.7.1 Upgrade and Refresher Training.

8.7.2 Loss of Plant-Specific Maintenance Knowledge.

8.8 Work Permits.

8.9 Maintenance Management Information Systems.

8.9.1 Work Order Tracking.

8.9.2 Process Equipment Files.

8.9.3 Process and Equipment Drawings.

8.10 Quality Control.

8.10.1 Replacement Parts.

8.10.2 Inspection.

8.10.3 Certified Equipment.

8.10.4 Continuous Improvement.

8.11 Contractor Safety.

8.12 Incident Investigation.

8.13 Summary.

8.14 References.

Addition References.

9. SHUTDOWN.

9.1 Normal Shutdown.

9.1.1 Pre-shutdown Planning.

9.1.2 Shutdown Sequence Steps.

9.1.3 Testing Safety Protective Systems.

9.1.4 Shutdown Period Maintenance Activities.

9.1.5 Unit Restart after Maintenance.

9.1.6 Formal Review of Shutdown.

9.2 Extended or Mothball Shutdown.

9.3 Sudden or Emergency Shutdown.

9.3.1 Preplanning for Student Shutdown.

9.3.2 Shutdown Sequences.

9.3.3 Safety Interlock Failures.

9.3.4 Investigation of Sudden Shutdown.

9.4 Emergency Response.

9.5 Summary.

9.6 References.

10. DECOMMISSIONING AND DEMOLITION.

10.1 Decommissioning/Demolition Plan.

10.2 Operation and Maintenance Roles.

10.3 Decommissioning Procedures.

10.4 Maintenance of Decommissioned Status.

10.5 Demolition Concerns.

10.6 Summary.

10.7 References.

Appendix A. Summary of the Process Safety Management Rule Promulgated by the Occupational Safety and Health Administration, United States Department of Labor.

Appendix B. Example Management Guidelines for the Safe Dismantling and Demoliton of Process Plants.

Appendix C. Examples of Site-Specific Demolition Checklist/Questionnaire.

Index.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 6747
若需訂購本書,請電洽客服 02-25006600[分機130、131]。

暢銷榜

客服中心

收藏

會員專區