Written by a career construction professional, this text about scheduling and project control addresses the average student, detailing all the steps clearly and without shortcuts. And now, for the first time, the book is part of a learning package that comes with access to an online course built around the book provided by online training leader Red Vector. Solved and unsolved exercises cover all subjects and computer software programs for construction are included for each chapter. The book, and by extension the class, presents precedence networks as the realistic solution to scheduling, the main part of project control, and introduces new concepts in CPM scheduling such as the author's own Dynamic Minimum Lag technique. The new edition includes coverage of building image modeling (BIM), lean construction, sustainability, and other cutting edge construction topics.
Saleh Mubarak, Tampa, Florida; Independent consultant in the field of construction project management, focusing on training, writing, and public speaking; Member of PMI and the PMI College of Scheduling. Served on the committee that created the PMI-SP professional scheduler certification exam; Formerly a project controls manager with the Public Works Department of Hillsborough County, Tampa, Florida; Formerly head of Civil & Architectural Engineering Department at Qatar University, as well as adjunct professor at University of South Florida, Keller Graduate School of Management and the Everglades University. Also worked as an Assistant Professor at Georgia Southern University and North Dakota State University.
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。