TOP
英國出版界指標大獎肯定!A.F. Steadman 獲年度作家,《史坎德》系列帶你踏上熱血奇幻旅程
Pumping Capacity Upgrade for Chad-Cameroon Pipeline. Second-Generation Drag Reduction Agent (DRA) Technology
滿額折

Pumping Capacity Upgrade for Chad-Cameroon Pipeline. Second-Generation Drag Reduction Agent (DRA) Technology

商品資訊

定價
:NT$ 1963 元
無庫存,下單後進貨(到貨天數約30-45天)
下單可得紅利積點 :58 點
商品簡介

商品簡介

Project Report from the year 2021 in the subject Engineering - System Science, grade: 3.9, Limkokwing University of Creative Technology, language: English, abstract: This paper examines the idea of increasing the pumping capacity of the Chad-Cameroon pipeline system by using second-generation drag reduction agent (DRA) technology. Evidence shows that it is technologically feasible to upgrade the pipeline system to a capacity of 500,000 barrels per day (bpd) for the cost of $364.4 million. This capacity assumes the use of both the TOTCO and COTCO pipelines, the report also presents several lower capacities, and lower cost options. The upgrades will take at least 42 months to install and commission. The pipeline upgrade has numerous important strategic benefits that can help enhance the Chad-Cameroon pipeline's reputation as a more stable, and reliable oil producer in the world market. In total, the Project would consist of approximately 664 miles of new, 36-inch diameter pipeline within the Chad and Cameroon. The proposed Project would have an initial capacity to deliver up to 500,000 barrels per day (bpd) of Doba's oil field from the proposed Kom?crossing to existing oil terminals in Dompla and Belabo. Existing binding commitments for the Project amount to 250,000 bpd of crude oil and as demand for Chad-Cameroon pipeline oil increases, the pipeline would increase its load, up to its initial capacity of 500,000 bpd. The Project could ultimately transport up to 700,000 bpd of crude oil through the proposed pipeline upgrade by adding additional pumping capacity if warranted by future market demand. The Project requires 18 new pump stations, 36 intermediate mainline valves (MLVs) of which 24 are check valves located downstream of major river crossings, approximately 50 permanent access roads and approximately 30 temporary access roads, one tank farm and two crude oil delivery sites.

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 1963
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區